Badalona ‘cut the tape’ of the new Stadium
Last Sunday, 29th of January, an Open House day took place at the new Stadium, which was opened to citizens to be visited. During the same afternoon, the enthusiast of the local team ‘CF Badalona’ were able to enjoy the first match against ‘RCD Español B’. The event was attended by the architect responsible for the project, Joan Carles Navarro.
The Municipal Stadium of Badalona is a building integrated within the slope and natural structure of the terrain, half-buried with practically no external presence and without facades, nor perimetral walls; but it sits in a natural way within the orography of the terrain. With an austere conception, a functional design and with a combination of materials that gives an elegant and integrated image; it has a capacity for 4.170 spectators expandable up to 12.000 and a pitch of 105×68 m.
The works have lasted for 19 months and have meant an investment of 7,18 million euros.
News extension – La Vanguardia
News extension – Ajuntament de Badalona
