09/11/2018
“Camp del Ferro” sports hall work continues
The first of the three courts of the sports hall designed in collaboration with BB Arquitectes and Gustau Gili has been covered. The building is characterized by the resolution of the façades by a ceramic latticework that we have designed exclusively for the equipment. The piece not only resolves the main enclosure but also avoids the impact of the solar radiation in the interior.
To this day, the structure and the grandstands of the two basement floors have been finished and the steel-girder frame of the first floor has been placed. During the next weeks the concrete nucleus will be finished and the steel-girder frame of the roof will be placed. Meanwhile the interior ceramic walls are being constructed.
