• Studio
    • About us
    • What we do
    • Architecture
    • MEP Engineering
    • Partners
    • Team
    • Quotes
    • Professional career
    • Clients
    • International
    • Publications
    • Awards
  • Architecture
    • Complete Work
    • Highlights
    • Chronological
    • Location
    • Sport
    • Hospitality
    • Residential
    • Education
    • Culture & Health
    • Rehabilitation
    • Public Space
  • Interior design
    • Highlights
    • Hotels
    • Offices / Retail
    • Hospitality
    • Wellness
    • Residential
    • Ephemeral
  • Sustainability
  • MEP Engineering
    • Complete Work
    • Highlights
    • Chronological
    • Location
    • Active sustainability
    • Sport
    • Hospitality
    • Residential
    • Offices
    • Cultural & Health
    • Rehabilitation
    • Public Space
  • Product
    • Air
    • Out. Lighting
    • Construction
    • Furniture
    • Int. Lighting
    • Installations
  • News
  • Contact
  • CA
  • ES
  • EN
  • Architecture
  • All
  • Selected Projects
  • Timeline
  • Ongoing Projects
  • Location
  • Sports
  • Hotel
  • Residential
  • Office
  • Culture
  • Education
  • Health
  • Public Space
  • INTERNATIONAL
  • Studio
  • News
  • PUBLICATIONS
  • Contact
  • Legal Notice
10/11/2023

Works begins on the new l’Illa Pavilion with two multi-sports courts

Works has begun on the new l’Illa Pavilion, which consists of two sports courts, a project that we have carried out together with Anna Noguera Architecture.

The volume that was the original sports hall is now completely demolished and we are in the process of redesigning the new structure that will give rise to a pavilion with two PAV2 sports courts. This new proposed volume will give continuity to the built and consolidated complex.

The new building has a polycarbonate envelope that integrates harmoniously into the complex thanks to this translucent material. A new vertical garden will serve the dual function of greening the courtyard of the Santa Teresa de Lissieux school and protecting the south façade of the new sports centre from solar radiation.

The expected completion date of the works is next February 2025. Stay tuned, we will continue to inform you about the evolution of the works through the networks!

IMG_20230801_201022
  • Studio
    • About us
    • What we do
    • Architecture
    • MEP Engineering
    • Partners
    • Team
    • Quotes
    • Professional career
    • Clients
    • International
    • Publications
    • Awards
  • Architecture
    • Complete Work
    • Highlights
    • Chronological
    • Location
    • Sport
    • Hospitality
    • Residential
    • Education
    • Culture & Health
    • Rehabilitation
    • Public Space
  • Interior design
    • Highlights
    • Hotels
    • Offices / Retail
    • Hospitality
    • Wellness
    • Residential
    • Ephemeral
  • Sustainability
  • MEP Engineering
    • Complete Work
    • Highlights
    • Chronological
    • Location
    • Active sustainability
    • Sport
    • Hospitality
    • Residential
    • Offices
    • Cultural & Health
    • Rehabilitation
    • Public Space
  • Product
    • Air
    • Out. Lighting
    • Construction
    • Furniture
    • Int. Lighting
    • Installations
  • News
  • Contact