Sports and Leisure City in Torrent
Client/Owner:
Ajuntament de Torrent
Area:
57.500m2
Intervention Cost:
3.537.000 €
Architects:
Pujol Arquitectura
Work done:
MEP Engineering Project, Site Management and Licences
Capacity:
Indoor swimming pool 25.00 x 16.66 m and indoor swimming pool 16.66 x 8.00 m /1000 people
Date:
2005-2007