Basic functioning depends on two central vertical communication cores, enclosing four lifts and two stairways that fulfil all requirements in terms of being adapted for public use. On each side of the stairways there are installations that concentrate all of the specific services for each of the floors, along with the stiles and air extraction conduits, as well as the sanitary water installations for each floor.