After several stages and different locations of the historic Club Natació Catalunya (CNC), the Barcelona City Council ceded in the early 1970s in concession to the CNC the municipal sports facilities of Can Toda. In 2006, the CNC commissioned the comprehensive reform and expansion of the center in AIA, with the aim of making it a benchmark of sports facilities in Barcelona.
The façade of the volume of the pools is made by using solar control glass in the lower strip and a double coating with orange cell polycarbonate panels, which allow to incorporate an adequate transmission factor and thus avoid excessive heating of the interior, minimizing the expected energy consumption to maintain optimal humidity and temperature conditions of the entire pool. For the cover, a structure of large laminated wooden beams of 30 meters in length is designed, on which a light cover of the type of sandwich is placed that guarantees with its composition the required thermal insulation. To this important operation of construction of the new indoor pools, is added the largest transformation that occurs in the area of the building, currently occupied by changing rooms, gym, access to stands, etc.
The main challenge of the project has been to convert into a single building what has been generated in different phases of extensions over the years: the building has been renormalized and reorganized volumetrically and spatially so that its final image and its operation are understood as a balancing and finite element.